TransItion STRategy on vegetAtion Management TRISTRAM

Start: 2019-01-1

End: 2020-12-31

Project code: 2019/ENV/624

Project director: Jerzy WISNIEWSKI

Project manager: Carole ESCOLAN ZENO

Background and Motivation

Looking at the high political and public pressure on the use of Glyphosate, the expiration of the Glyphosate license at EU level in December 2022 and the high probability of a Glyphosate phase-out, a transition strategy from chemical herbicide-based to integrated vegetation management has to be developed now in order to prepare the railways for the future.

The transition from chemical herbicide-based to integrated vegetation management with special focus on the railway track area constitutes a great challenge for the railways, since

  • 1) Chemical herbicide-based methods – with Glyphosate as the most important active substance – are today the most widely used and cost efficient as well as the most effective methods of vegetation control.
  • 2) All promising alternative methods of vegetation control - based on hot water, wet steam, organic acids and electro weeding - are currently not yet
    • fully matured technologically and thus require dedicated research and development efforts and further professionalization
    • adapted to the special needs and requirements of the railway sector
    • officially registered and approved for application in the railway sector
    • as cost efficient as methods based on conventional herbicides by far.

The objectives of this project are to:

  1. Develop a global strategy for the transition from chemical herbicide-based to integrated vegetation control for railway track area
  2. Facilitate and boost information and knowledge exchange (e.g. by standardized documentation) between railways on all aspects of integrated vegetation control with special focus on investigations and experiences with alternative methods of vegetation control for the railway track area including the regulatory constraints.
  3. Improve and expand the technology monitoring and assessment approach developed within the framework of the Herbie project with special attention to the acquisition of reliable data for the economic and operational performance of alternative methods for vegetation control
  4. Collect best practices and strategies for supporting integrated vegetation management approaches by IT tools and solutions
  5. Explore funding options (on national and EU level) for collaborative efforts of the railways regarding the adaptation of alternative methods of vegetation control to railway requirements.

7th R&D Framework Programme/Horizon 2020 Acoustic control for new composite blocks Administ of HERMES Messages + relating 900 Leaflets Administration of Passenger Commercial Issues Administration of Passenger Technical Issues Artificial Intelligence for Remote Monitoring Asset Management – unified procurement methods in order to achieve high quality for less money Asset Management Common Method and Template in a GIS implementation Brake Performance Deficiency of UCT (Unaccompanied Container Transport) trains Capacity4Rail Commuter and Regional Train Services Commuter and Regional Train Services II Composite brake block behaviour under winter conditions DEcision-making and Slab-track MANagement Design, definition and localisation of a "Trackcircuit" for detection of broken rails without detect DIGIM DIGIM 2 Digital Observatory & New Projects Platform Direct electropneumatic brake Direct Radio Link for Train Completeness Safety Check DOOR TO DOOR e- WAG ECCO Phase 2 ECCO Phase 3 EES Platform Activitie Emergency Brake Valves Performance on ERTMS Lines Energy & Electric Traction Experts Group Energy Efficiency Best Practice Workshops Energy Efficiency Best Practice Workshops (Europe) eRail Freight Intermodal – Phase 2 ERTMS Platform services EUR palette European Standard Freight Wagon Axle for 25t (ESFA 25) Exceptional and Over-Loads on Existing Infrastructures Exchange of Railway Vehicules phase 2 Formalization of Interfaces Functional Specifications Future Railways Mobile Communications Systems Solutions GALILEO Panel of Experts GSM-R GSM-R Network Management Harmonised Methodology for Infrastructure Lifetime Assessment Harmonization of track quality description and assessment High Speed Activities Holding Force 2017 How to improve the overall safety at level crossings using new technologies and operating modes to m Impact of the digitalisation on the modern Traffic Operation possibilities (linked to “Traffic manag IPAAB AUDIT Lasting Infrastructure Benchmarking Long term development of railway stations Long trains with distributed power MERITS PRIFIS New UIC Standard "Overhead Conductor Rail Requirements" Noise Technical Advice Other Freight Activities Panel of Experts Activity - Asset Management Group Panel Of Structural Experts Passenger Accessibility Solutions Support and Action Group for Europe Passenger Accessibility Solutions Support and Action Group for Europe II Passenger Door System, Alarm System and Communication System: Safety and Standardised Operation PRIFIS PRM Assistance Booking Tool RailTopoModel (ERIM) RailTopoModel extension for Building information modelling (BIM) RailTopoModel for Geographic Information Systems RailTopoModel for Simulation Railway Telecom Panel of Experts Recommendations for the DEsign and use of MOnoblock concrete SLEEPERs REFERENCE GUIDE OF CORE RAIL JOB PROFILES AND PROFESSIONAL COMPETENCES Requirement DataBase EUTREQ REVERSIBLE SUBSTATIONS Revision of UIC Leaflet 930 RIC Rolling Stock Bogie Energy Management and Brake-Wheel interaction Rolling Stock multimedia applications Rolling Stock on board applications (traction-braking management) and commissioning Rules for the consist and braking of international freight trains SAFETY PLATEFORM SATLOC+ (follow up of SATLOC) system safety demonstration on the basis of the formal functional mode SECURITY PLATFORM SFERA: Smart communications for efficient rail activities Signalling Panel of Experts Station Managers Global Group Station Managers Global Group Technical advice and assessment of European Railway noise policy and research Tourism potential of railway services Tourism Potential of Railway Services 2 Track Circuit Shunting Booster Track Experts Group Activity - (TEG) including INNOTRACK Dissemination Track stability and prevention of buckling Train Bus Applications and Homologation TRAINING CENTRE NETWORKS TransItion STRategy on vegetAtion Management UIC Control App UIC-IEC Overhead Contact Line life cycle harmonization Upgrading and Updating the UIC Standard 413 URT - PRISM (Passenger Railway International Security-based Mobile app) Vegetation Control and Use of Herbicides WG Pallets Wheel: European Standard low maintenance for 25t traffic Works of Programme Managers and SETs XBORDER quick wins