DIGIM Digital Impacts on Business Processes

Start: 2017-09-1

End: 2018-07-1

Project code: 2018/DIV/598

Project director: Francis BEDEL

Project manager: Francis BEDEL

Digital technologies underpin new paradigms in innovation and competitiveness across a broad range of market sectors. It is therefore necessary to identify the main digital potential fields and key enabling technologies which could result to quick and high benefits for the railways sector.
All fields of the digital sector should be investigated taking in consideration their applicability in the global railway system. The project will focus on the digital technologies which could lead of quick wins for the railway business.
This project provides the opportunity to develop a common approach for the benefit and interest of the Rail community by identifying:

  • risks and opportunities analysis of the application of digital promising technologies in the railway sector
  • Priorities and recommendations for the implementation of digital technologies
  • potential partnerships with high level center of competence developing digital enabling technologies

DIGIM Programme

DIGital IMpacts on business processes is a transverse and a worldwide programme in UIC to use the new digital technologies to support the development of business processes, to improve safety and security in railway, to optimise the operations and to better use the existing data.

DIGIM1

The program initiated by UIC and 6 members were involved: ViaRail, RZD, RAI, FS, RSSB, CFL
3 projects were defined in this programme:

  • Core-Project : Digital impact on Business Processes
  • Clear Station
  • Connected level crossing (phase 1)

Core-Project
A survey was done among members of DIGIM programme with the aim to collect of all initiatives and requirements necessary for the selection of most relevant digital enabling technologies that could easily be developed and lead to quick wins for the Railway sector. The result consists of:

  • Digital impact on Business Processes, pros and cons
  • Digitalization in railways and pre-requisites for digitalization
  • Fields of development considering DIGIM Project
  • Quick wins for the Railway sector and technologies to use
    The next phase of survey will be lunched among all UIC members.

Clear Station
Providing assistance to blind passengers inside station:

  • To provide accessibility for all users
  • To enhance customer experience

Phone application for indoor navigation

  • An application based on Bluetooth beacons successfully developed, tested and implemented in Ottawa station
  • It has adapted interface to give the person the information he needs and to locate the person inside the station

Connected level crossing

  • Optimize the closing time of the barrier at level crossing by considering the speed of train
  • An application(software) has been developed to compare theoretical train time-table and real time information based on GPS to determine the optimize time of closure at level crossing. The application is designed and tested in Canada.

DIGIM 2

7th R&D Framework Programme/Horizon 2020 Acoustic control for new composite blocks Administ of HERMES Messages + relating 900 Leaflets Administration of Passenger Commercial Issues Administration of Passenger Technical Issues Artificial Intelligence for Remote Monitoring Asset Management – unified procurement methods in order to achieve high quality for less money Asset Management Common Method and Template in a GIS implementation Brake Performance Deficiency of UCT (Unaccompanied Container Transport) trains Capacity4Rail Commuter and Regional Train Services Commuter and Regional Train Services II Composite brake block behaviour under winter conditions DEcision-making and Slab-track MANagement Design, definition and localisation of a "Trackcircuit" for detection of broken rails without detect DIGIM DIGIM 2 Digital Observatory & New Projects Platform Direct electropneumatic brake Direct Radio Link for Train Completeness Safety Check DOOR TO DOOR e- WAG ECCO Phase 2 ECCO Phase 3 EES Platform Activitie Emergency Brake Valves Performance on ERTMS Lines Energy & Electric Traction Experts Group Energy Efficiency Best Practice Workshops Energy Efficiency Best Practice Workshops (Europe) eRail Freight Intermodal – Phase 2 ERTMS Platform services EUR palette European Standard Freight Wagon Axle for 25t (ESFA 25) Exceptional and Over-Loads on Existing Infrastructures Exchange of Railway Vehicules phase 2 Formalization of Interfaces Functional Specifications Future Railways Mobile Communications Systems Solutions GALILEO Panel of Experts GSM-R GSM-R Network Management Harmonised Methodology for Infrastructure Lifetime Assessment Harmonization of track quality description and assessment High Speed Activities Holding Force 2017 How to improve the overall safety at level crossings using new technologies and operating modes to m Impact of the digitalisation on the modern Traffic Operation possibilities (linked to “Traffic manag IPAAB AUDIT Lasting Infrastructure Benchmarking Long term development of railway stations Long trains with distributed power MERITS PRIFIS New UIC Standard "Overhead Conductor Rail Requirements" Noise Technical Advice Other Freight Activities Panel of Experts Activity - Asset Management Group Panel Of Structural Experts Passenger Accessibility Solutions Support and Action Group for Europe Passenger Accessibility Solutions Support and Action Group for Europe II Passenger Door System, Alarm System and Communication System: Safety and Standardised Operation PRIFIS PRM Assistance Booking Tool RailTopoModel (ERIM) RailTopoModel extension for Building information modelling (BIM) RailTopoModel for Geographic Information Systems RailTopoModel for Simulation Railway Telecom Panel of Experts Recommendations for the DEsign and use of MOnoblock concrete SLEEPERs REFERENCE GUIDE OF CORE RAIL JOB PROFILES AND PROFESSIONAL COMPETENCES Requirement DataBase EUTREQ REVERSIBLE SUBSTATIONS Revision of UIC Leaflet 930 RIC Rolling Stock Bogie Energy Management and Brake-Wheel interaction Rolling Stock multimedia applications Rolling Stock on board applications (traction-braking management) and commissioning Rules for the consist and braking of international freight trains SAFETY PLATEFORM SATLOC+ (follow up of SATLOC) system safety demonstration on the basis of the formal functional mode SECURITY PLATFORM SFERA: Smart communications for efficient rail activities Signalling Panel of Experts Station Managers Global Group Station Managers Global Group Technical advice and assessment of European Railway noise policy and research Tourism potential of railway services Tourism Potential of Railway Services 2 Track Circuit Shunting Booster Track Experts Group Activity - (TEG) including INNOTRACK Dissemination Track stability and prevention of buckling Train Bus Applications and Homologation TRAINING CENTRE NETWORKS TransItion STRategy on vegetAtion Management UIC Control App UIC-IEC Overhead Contact Line life cycle harmonization Upgrading and Updating the UIC Standard 413 URT - PRISM (Passenger Railway International Security-based Mobile app) Vegetation Control and Use of Herbicides WG Pallets Wheel: European Standard low maintenance for 25t traffic Works of Programme Managers and SETs XBORDER quick wins