Reduction cost of catenary

Complete electrification or partial electrification:
3a. Do you accept to diverge from standardized requirements on reduced insulation?
4a. Do you accept other overhead contact line (OCL) gap where the gauge is not sufficient enough, where the clearance is not right ?
6. What kind of technical solutions do you have to reduce the construction cost of OCL (CAPEX)?
7c. What would be the perfect track operating stop to perform the work?
8a. When renewing, do you rebuild completely?
9. If the contact wire is not too weared, do you reuse the contact wire on other lines (ie lower traffic)?
Power supply:

Share this