Long trains with distributed power

Start: 2018-01-1

End: 2019-12-31

Project code: 2018/RSF/573

Project director: Christian CHAVANEL

Project manager: Giulia RUSSO

Problem to solve:

  • Implementation of freight cross-border traffic exploiting new technologies such as remote control
  • Increase and optimisation of tonnage/length of freight trains
    Added values:
  • Additional development of the TrainDy software
  • Follow-up, practical implementation and adaptation of the statistical methodology of the UIC421 project for remote controlled trains
  • Validation of TrainDy results with tests carried out in the Shift2Rail project
Share this
Wednesday 30 September 2020

Projects

Project
TER4RAIL
Transversal exploratory research activities for (...)
2020-10-14 10:23:27
Project
SIA
System for vehicle infrastructure Interaction (...)
2020-10-13 20:27:58
Project
Composite brake block behaviour under winter conditions
2020-10-13 20:29:17
Project
Long term development of railway stations
2020-10-13 20:29:17
Project
Station Managers Global Group
2020-10-13 20:29:17
Project
WG Pallets
2020-10-13 20:29:17