Start: 2018-01-1
End: 2018-12-31
Project code: 2018/RSF/575
Project director: Marc ANTONI
Project manager: Victoria CALLEJA DURO
Determination of the technical requirements for reversible substations and identification of the kinds of railway lines suitable for the installation of the energy recovery systems. Identification of the technical requirements needed to install energy recovery modules on the previously selected substations, taking into account the power to be installed, the interaction with the existing power equipment, the integration mechanisms and the substation interlocks, commissioning process, maintenance requirements, etc. Development of technical processes to include energy recovery systems in railway substations.