REVERSIBLE SUBSTATIONS

Start: 2018-01-1

End: 2018-12-31

Project code: 2018/RSF/575

Project director: Marc ANTONI

Project manager: Victoria CALLEJA DURO

Determination of the technical requirements for reversible substations and identification of the kinds of railway lines suitable for the installation of the energy recovery systems. Identification of the technical requirements needed to install energy recovery modules on the previously selected substations, taking into account the power to be installed, the interaction with the existing power equipment, the integration mechanisms and the substation interlocks, commissioning process, maintenance requirements, etc. Development of technical processes to include energy recovery systems in railway substations.

Share this
Thursday 30 August 2018

Projects

Project
TER4RAIL
Transversal exploratory research activities for (...)
2020-10-14 10:23:27
Project
SIA
System for vehicle infrastructure Interaction (...)
2020-10-13 20:27:58
Project
Composite brake block behaviour under winter conditions
2020-10-13 20:29:17
Project
Long term development of railway stations
2020-10-13 20:29:17
Project
Station Managers Global Group
2020-10-13 20:29:17
Project
WG Pallets
2020-10-13 20:29:17